Sheet replacement, overcladding, rooflights, gutters, surveys, maintenance and leak call-backs. The price for each one is agreed after a survey.
01
Roof sheet replacement
Metal profile and fibre-cement sheets replaced where they have failed, corroded or cracked.
Fixings pull out, coatings chalk, and a single cracked sheet lets the weather into the insulation. We replace the failed area or the whole slope, depending on what the survey shows.
Cut-edge corrosion, missing fillers and tired rooflights usually show up at the same time. They go in the same scope, so the roof is not opened twice.
A new metal skin over an old asbestos-cement roof, where the existing sheets are still stable.
Many older industrial roofs are asbestos-cement. Where the sheets are still stable, a new metal skin can be fixed over them on spacer rails. The old sheets stay in place, which avoids the disturbance of taking them off.
It is not the right answer on every roof. If the deck is soft, the purlins are tired, or the sheets are already breaking up, we will say so. Licensed removal is a separate specialist job. We do not describe it as a quick strip-off, and we do not publish a removal method.
Typical work
Survey of the existing asbestos-cement roof before anything is promised
Overcladding with a new metal profile system where it is suitable
A plain no, with the reason, when overcladding is the wrong fix
Diagram below is the principle only. It is not a specification and it is not a method for disturbing asbestos.
The existing asbestos-cement sheet stays put. Nothing on this drawing is a method for removing it.
In-plane rooflights replaced where they leak, have gone brittle, or are no longer wanted.
Old rooflights are a common leak path. They also age, and many no longer match what you would want under a fragile-roof regime. We replace in-plane rooflights in metal and fibre-cement roofs, and we can take them out of a slope where the daylight is no longer needed.
The surrounding sheets and flashings are made good with the light. The product — GRP, polycarbonate or a solid sheet — is chosen after the survey, not from a guess at the thickness.
Typical work
Like-for-like in-plane replacement
Closing off a rooflight opening
Making good the sheets and flashings around the opening
Valley and boundary gutters cleared, repaired, and lined where the steel is pitted but still sound.
Industrial gutters silt up, split at the joints and overflow back into the building. The leak is often blamed on the sheets when the water is coming over a blocked valley.
We clear, repair outlets and joints, and line the gutter where the body will take a lining. If the steel has gone too far for a lining, we say that and price a replacement instead.
A walkover and a written report for a purchase, a landlord, or a roof you simply need to understand.
A survey is a look at the roof and a written account of what we found: photographs, what needs doing now, and what can wait. It is the right first step before a purchase, a conversation about dilapidations, or a maintenance plan.
This is a contractor's condition report. It is not a chartered building survey, and the report says so. If the roof is not safe to walk, we survey from a suitable platform or from the eaves and we tell you that.
A visit programme for landlords, trading estates and property managers.
A roof that is looked at on a programme fails more quietly than one that is only called about when the carpet is wet. Plans cover inspections, gutter clears and the priority of a call-out.
The pattern of visits is on the maintenance page. The price is not. Every contract is agreed after we have seen the buildings.
Typical work
Bronze, Silver and Gold visit patterns
Written notes after each inspection
Repairs quoted separately, so the plan is not an open cheque
A call-back for an active leak. The form does not book an arrival time.
If water is coming in, use the emergency form. Tell us where it is showing, what sits underneath it, and whether people are still in the building. We phone you back and agree what happens next.
The form is a request for a call-back. It is not a confirmed attendance and it is not a substitute for the fire service. If anyone is in immediate danger, call 999.
Typical work
Active leaks into occupied or empty units
A phone call to agree the next step
A proper repair scoped once the water is understood