Health and safety

Work at height, planned before anyone goes up

Fibre-cement sheets and rooflights are fragile. The method for each roof is written down before the job, and it is not the same method on every building.

Workers on a timber house frame wearing harnesses while a roof truss is lifted into place. Public-domain photograph, not a SheetLine job.
Stock photograph, not a SheetLine job. National Institute for Occupational Safety and Health (NIOSH). Public domain.
A trainer indoors checking the fit of a yellow fall-arrest harness. Public-domain photograph, not a SheetLine job.
Stock photograph, not a SheetLine job. National Institute for Occupational Safety and Health (NIOSH). Public domain.

Fragile roofs

Old fibre-cement sheets, and the rooflights set in them, will not hold a person. We do not treat them as a floor. Where the roof cannot be walked, the survey and the work are done from a safe place: crawl boards where they are the right tool, safety netting under the slope where the building allows it, edge protection at the open edge, or a MEWP so nobody has to stand on the sheet.

The photographs on this page are stock pictures of harness checks and of people tied off on a timber frame. They are not photographs of SheetLine at work, and they are not a method statement.

HSE explains the duty in work at height, roof work, fragile surfaces and the short note GEIS5, fragile roofs.

CDM 2015

Construction work on a commercial building sits under the Construction (Design and Management) Regulations 2015. Who does what depends on whether there is more than one contractor and whether the job is notifiable. We say, before the work starts, which role we are taking and what we need from the client: asbestos information, access, and who else is on site.

Read HSE's guide to CDM 2015 and the regulations themselves on legislation.gov.uk.

RAMS

Each job gets its own risk assessment and method statement. It names the access, the fragile areas, how materials come up and go down, and what happens if the weather turns. It is sent before we start, not written afterwards. A generic sheet is not a RAMS for your roof.

People still in the building

If the unit is trading, we agree where people can and cannot walk, where the skip sits, and whether the power under the work has to be isolated. Water and tools do not get dropped into an occupied bay. If that cannot be arranged, we say so and we do not start.

Insurance and cards

The lines below are blanks. They are not claims that a policy or a card is held. They stay marked TODO until the document is in the file and the wording has been replaced.

Asbestos cement is covered on its own page, including when the work has to go to a licensed contractor. Read the asbestos guidance.

Book the survey before the method is promised

We will not price a method we have not seen the roof for.